Project consists of removal and replacement of carpet on the third floor of the Continuing Education Center. Scope of work consists of moving loose and built-in furniture, removal of existing carpet, base and terminations, preparation of existing floors, installation of new carpet, base and terminations and reinstallation of furnishings.
Schedule of work to be completed between 11 July, 2011 and 24 July 2011. Estimated cost of project is $15,000.00