The contract comprises the construction and testing of approximately 23 km of 1200mm diameter HP steel gas pipeline between Farningham and Hadlow and the relocation of a pigging facility. Approximately 23 km of the pipeline is located in fields/agricultural land with a number of road and rail crossings. There will also be a number of specialist crossings required utilising tunneling or drilling techniques with a cumulative length of over 1 km. Accommodation works and full reinstatement of affected land will also form part of the contract.