The RFP Database
New business relationships start here

Construction of Wet Curve


Virginia, United States
Government : County
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The reconstruction shall consist of modifications to the existing horizontal and vertical roadway within this stretch of the corridor. A major culvert will be replaced. The stretch of the roadway being re-constructed will be widened to include 12’ wide lanes and 6’ wide shoulders. The work will include clearing, grading, asphalt paving, drainage structures, erosion and sediment control, signage, pavement markings, relocation/adjustment of utilities and other items necessary for the completion of the work.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP