Construction of new 31,000+/- sf 2story steel framed addition to an Existing library. The
project includes demolition of existing addition(s); and hazardous material abatement as required to
accommodate the new facility; full restoration and repairs to the original historic structure; new HVAC,
plumbing, and fire suppression systems, electrical and tel/data infrastructure. Sitework will include tasks
related to construction, modifications to the existing library parking lot, and modification of adjacent
bank parking area to create a new entrance driveway. The library will be unoccupied
during construction. Existing library materials (books, equipment, etc.) will be removed by others prior
to construction. Construction is anticipated to begin January 2014 with a project duration of 18 months.
The completed facility will seek LEED certification.