The project scope consists of the construction of 1.67 miles of roadway improvements. Improvements include widening to 4 lanes with multi use lanes, improved roadside drainage, sidewalks/paths, landscaping and a retaining wall where required. Median is to be a raised landscape median, and existing cross culvert drainage will be enlarged and expanded. A significant drainage structure will be included.
Note: this is an extended due date.