The proposed work includes the design, permitting and construction of a 20-foot minimum clear-span, double-lane bridge with 6 feet of rise from average stream bed to bottom of superstructure. Contractors will furnish labor, material and equipment necessary to remove and replace existing bridge and will be responsible for providing and removing the temporary bridge after the new bridge is open.