The project consists of: clearing and grubbing, removal of structures and obstructions, roadway excavation, removal of unsuitable materials, grading, asphalt and concrete paving, sidewalk, curb and gutter, installation of storm sewer structures, installation of water mains and associated appurtenances; relocation of water services; construction of a joint utility trench together with conduits for power, telephone, cable, street lighting, and fiber optic cable; installation of street lighting, traffic signals; channelization, landscaping and retaining walls.