The Town is soliciting Construction Inspection Services for the above referenced project. Construction includes, but is not limited to the following: Removal of Town Bridge #25 and partial removal of the west abutment and construction of a new roadway along the eastern edge of the Little River. The required services being solicited are outlined in Section II of this Request for Qualifications (RFQ).