Construction includes, but is not limited to, the following: The installation of two prefabricated truss bridges, two new concrete abutments, modifications to two existing abutments, installing precast retaining walls, related approach work on the trail, unclassified channel excavation, installing stone fill, and install bridge approach timber guard railing.