Mandatory pre-bid meeting 12/01/2009.
The Road project involves the construction of approximately 3,000 feet of four lane divided concrete boulevard section with a raised median to replace the existing two lane asphalt roadway within 80 feet Right of Way. The proposed pavement structure consists of 10-inch concrete underlain by 6-inch lime-flyash stabilized subgrade. The proposed construction also includes the storm sewer systems and a traffic signal at Road intersection.