Mandatory pre-bid meeting 04/28/2010.
Project consists of the construction of approximately 5,200 LF of four lane concrete roadway section with a continuous left turn lane (fifth lane), curb and gutter, with storm sewer, traffic signals/modifications, widening the existing bridge. The proposed pavement structures consist of 10-inch concrete underlain by 8-inch lime stabilized subgrade. The proposed construction also includes the water, sewer and sidewalks on both sides of the roadway.