Projects consist of but are not limited to the following work items:
• Bridge removal and replacement with a 3-sided box culvert
• Deck replacement with widening
• Structural steel repairs
• Substructure patching
• Deep overlay
• Bridge barrier replacement
• Bridge approach reconstruction
• Construction of filtration basin
• Typical approach work to be done for all (5) structures