Construction of a Multi-Use Trail. The contract consists of providing labor, equipment, and materials for the rehabilitation of an abandoned Railroad Right-Of-Way into a 13 ft bituminous paved Multi-Use Trail. Construction will entail tree clearing, grading, and installation of a prefabricated bridge structure, drainage, processed aggregate, bituminous concrete, topsoil, plantings, fencing, and signage.