Mandatory pre-bid conference 02/29/2010.
SCOPE OF WORK:
1. Contractor to construct roof mounted supports to receive new Mass Notification Warning
System rooftop speakers (Siren Assembly Base) equipment at four (4) existing campus
buildings.
2. Outside excavation and backfilling for direct burial pole for ground mounted speaker.
3. Cutting and patching of existing roofing at four roof mountings including interior ceilings.
4. Attachment of speakers provided by owner, to new roof mounted supports.