The RFP Database
New business relationships start here

Concrete Obstacle Course


Oklahoma, United States
Government : Military
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Construction of concrete obstacle course for 71 SFS Military Working Dog.

All description of work details and requirements are in the attached statement of work, therefore quotes should be submitted based solely on the statement of work.

PART 1     GENERAL

Points of Contact:
Facility Manager: TSGT Ian Porter, 580-213-7163
Base Construction Management: Jason Weber, 580-213-5197

1.02     SCOPE OF WORK,   See attached Statement of Work
1.03     SCHEDULE OF WORK See attached Statement of Work
A. The contractor will build forms and pour concrete pad as necessary to set the following 8 obstacles. All surfaces of the obstacles that the dogs may traverse will be covered with a non-skid material. The footing and pad is described with each individual obstacle listed below Item 3 is listed as three (3) separate obstacles.

1. One concrete tunnel 4' x 12' x 32". With a concrete footing that is 1' wide and 1'6" deep with and 8" pad for it to sit on.

2. One stair obstacle that is 24' x 3'7" x 8' with a footing that is 1' wide and 1'4" deep. It will sit on a pad that is 8" thick.

3. Three(3) concrete hurdles, two hurdles being 4' x 30"x 30" and one hurdle being 4' x 18" x 18".They will sit on a concrete pad that has a footing 1' wide and 1'4" deep. The pad is 4" thick.

4. One concrete window that is 7'6" x 6' x 8'. Window will set on a pad with a footing that is 1' wide and 1'4" deep and the pad will be 8" thick.

5. One A-Frame that is 4"x 11" x 6'. A- Frame will set on a pad with a footing that is 1' wide and 1'4" deep - pad will be 6" thick.

6. One dog walk 20' X 1' x 2'2", dog walk will set on a concrete footing and pad that is 3' x 20' x1'4" deep.

1.04   CONTRACTOR'S REPRESENTATIVE,  See attached Statement of Work
1.05   PROVIDED SERVICES AND UTILITIES,  See attached Statement of Work
1.06   INSPECTION,  See attached Statement of Work
1.07   EXCESS MATERIALS (EXCLUDING HAZARDOUS MATERIALS OR WASTE)
See attached Statement of Work

1.08 SPECIAL MATERIALS,  See attached Statement of Work
1.09 MATERIALS,  See attached Statement of Work

PART 2     EXECUTION

2.01 INSTALLATION     See attached Statement of Work


Upon awarding the following will need to be completed :

1. Certificate of Liability will need to be provided.
2. Base Access forms with background check will need to be completed before entering base.
3. The attached forms will need to be completed and returned  before award is made.



Only  quotes  that include all Labor and  Materials according to the Statement of Work will be considered. 

Carmella Holtz, Buyer, Phone 580-213-7583, Fax 580-213-6047, Email carmella.holtz.ctr@us.af.mil - , Email vance.localpurchase@us.af.mil

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP