The RFP Database
New business relationships start here

Communications Center HW/SW Upgrade


Illinois, United States
Government : Federal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

*********************** 7/8/14 CHANGE  ****************************
A CORRECTION IS MADE TO THE 7/3/14 RADIO SPEC. MODIFICATION BELOW.
THE PREFERRED SYSTEM IS A ZETRON 4020, NOT A 4010. PLEASE BE ADVISED.
*****************************************************************


++++++++++++++ 7/3/14 RADIO SPEC. MODIFICATION ++++++++++++++++
"The preferred system is a Zetron 4010, or approved equivalent. The Radio Dispatch Console shall be a self-contained, multichannel, radio control console. Subcontractor is welcome to bid an IP based solution, such as the Zetron MAX, as a separate bid in addition to the base bid. Alternate solutions that utilize software on a PC or Workstation may be bid as a separate bid, in addition to the base bid. ++++++++++++++++++++++++ ATTENTION ++++++++++++++++++++++++


FYI . . . . . . .
FERMILAB IS A 6700 ACRE DEPT. OF ENERGY SITE DOING HIGH ENERGY PHYSICS RESEARCH. THIS INCLUDES APPROX. 1800 EMPLOYEES SOME OF WHICH ARE DEPLOYED TO ONE OF DOZENS OF ON SITE BUILDINGS INCLUDING A 15 STORY CENTRAL OFFICE CENTER WHERE SITE WIDE RADIO AND TELECOMMUNICATIONS OPERATIONS IS CENTERED IN SUPPORT OF SECURITY AND SAFETY COMMUNICATIONS AND OBJECTIVES.

Mark J. Graczyk, Procurement Administrator, Phone 6308404895, Email [email protected]

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP