The Project consists of the monitoring and maintenance of an existing wastewater flow and rainfall monitoring system and the delivery of reliable, accurate wastewater flow and rainfall monitoring data to the Owner. The existing system consists of sixteen flow monitoring locations at critical locations in the wastewater collection system and five rain gauges throughout the County at select flow monitoring sites.