The work under this contract consists generally of renovation of the switch houses such as replacement of the roof, doors, access ladders/rails, installation of HVAC equipment, ductwork and controls, structural steel and concrete work, electrical work, furnishing and installation of temporary covers and enclosures to protect the contents of the switch houses from the weather during construction and performance of related Work.