The RFP Database
New business relationships start here

Civic Center Infrastructure Upgrades Programmable Lighting Control System


California, United States
Government : Municipal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Provide labor and materials required to install, test and place into operation the electrical
systems, including all incidental and related work as required by Construction Documents
herein (Project).
The estimated cost of construction is in the range of $65,000 to $80,000.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP