This project is to design and replace the existing chillers based upon the recommendations of the study. The existing chilled water system supports both Halls and is composed of three cooling towers, cooling water and condenser water pumps, one centrifugal chiller and one decommissioned absorption chiller. Upon completion of this project, the new chiller system will be sufficient enough to support the current and future cooling demands.