The RFP Database
New business relationships start here

Chilled Water Distribution System, Equipment and Controls

  1. This RFP had a pre-bid event.


Hawaii, United States
Education : University
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The project shall generally consist of removal and replacement of chilled water pumps, new piping, valves, insulation, pipe supports, air separator, expansion tank, concrete, excavation, backfill, asphalt patching, traffic control, lead based paint and asbestos control measures, DDC system, painting, roof flashing, wall patching, ceiling removal and replacement, and electrical, complete.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP