This document has expired, therefore the above link may no longer work.
Mandatory pre-bid meeting 02/24/2010.
The Project consists of erosion repairs. Major emphasis of this repair contract will be earthwork, including but not limited to erosion repair, pipe replacement, riprap installation, and related items.