Temporary construction fencing. Clearing and grubbing for access roads. Installing and operating temporary dewatering systems and dispersion systems. Moving and cleaning existing log jams, excavating and filling the spawning channel and laying in streambed sediment. Furnishing and installing logs with rootwads along with anchoring. Obtaining and installing landscape plantings. Restoring the access road and other construction disturbance areas. Restoring all surface features damaged by construction.