Mandatory prebid conference on June 15, 2010. Demolition and removal of the existing Hydraulic Stag/Orchestra Lift Equipment, Platform, and all related existing hydraulic pump, guiderails, motors, mechanical and electrical components, up to and exclusive of the existing electrical disconnect switch in the existing Pump Room.