The work to be perfomed, in general, consists of furnishing all labor, tools, equipment, transportation, and materials required to complete the work for the renovation and remodeling of the existing facility for the Art Center. Construction includes, but not limited to, the creation of a Children's Wing with associated drop off area and courtyard space for sculpture garden and deck; roof replacement; repair and replacement of deteriorated wood members; replacement of interior finishes; partial replacement of glazing, doors, windows and hardware; toilet core upgrades for accessibility; and upgrades to exterior and interior circulation for ADA accessibility requirements, Upgrades or replacement of mechanical, electrical, lighting, plumbing, fire protection, fire alarm, and structural systems, Landscape and site, grading, and other civil work, and all incidental and related work.
Note: pre-bid conference is not mandatory, but attendance is strongly encouraged.