This RFP is intended to result in the selection of a design consultant for the Carlson Center Improvements Phase II locker room remodel. The affected space includes the lower level east side of the Activity Center. The current space contains two general locker room areas, the team room, and general storage. The existing facilities, excluding the mechanical room and possibly some electrical spaces, will be demolished.