Demolition and removal of the existing irrigation pump station to include the electrical connection from the source to the pump; modification of the existing potable water connection, eliminating landscape irrigation and dedicating the pump as a potable water source with the necessary pipe and spigots; the removal and disposal of irrigation valves and the protection in place of existing valves per the approved plan and specification; the installation of a new irrigation system to include pump, electrical connection, mainline,
wiring, irrigation valves; the expansion of the northern parcel of the cemetery, to include grading, asphalt access road, construction of new block walls, new irrigation system, slope stabilization, parcel markers, tree planting and turf establishment; to include all necessary equipment to insure a complete and operation irrigation system and cemetery expansion.