The purpose of this Castle Rock Hazardous Fuels Reduction and C&L Expansion 2 Hazardous Fuels Reduction projects is to reduce forest fuels and attain both horizontal and vertical fuel separation in forested stands within the treatment units using various techniques of fuel reduction, green tree thinning, and yarding of fuels. Road Maintenance is required as part of accessing the project location.
This work will include, but not limited to, all labor, management, supervision, tools, materials, equipment, incidental engineering and transportation necessary to perform the stated purpose of this statement of work and may include, cutting, piling and removal of; standing and downed trees, dead and live brush, limbs and designated live conifers, existing slash and forest debris resulting from current and prior operations and/or events.
Potential equipment that will be required to accomplish all work requirements include but are not limited to: rubber tired skidder with grapples and "bull line", mobile chipper, "small" mobile cable yarder or helicopter, masticators, chainsaws, and directional felling equipment.
Patrick J. Gallegos, Contracting Officer, Phone 559 297-0706 Ext. 4830, Fax 559-294-4833, Email [email protected]