Carson/Bridgeport (Humboldt-Toiyabe NF) Campground Crack Sealing Project


Idaho, United States
Government : Federal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The intent of this project is to extend the service life of existing pavements in several campgrounds in the Bridgeport and Carson Ranger Districts on the Humboldt-Toiyabe National Forest through crack sealing and incidental striping. The project includes work at several locations in two general areas:
T4N, R24E, MDB&E, Approximately 15 miles southwest of Bridgeport, CA off of Buckeye Robinson Creek Road: (BASE ITEMS)

PAHA CAMPGROUND: Perform crack sealing according to the schedule of items.


CRAGS CAMPGROUND: Perform crack sealing and pavement repair according to the schedule of items.


LOWER TWIN LAKES CAMPGROUND: Perform crack sealing according to the schedule of items.


ROBINSON CREEK CAMPGROUND: Perform crack sealing according to the schedule of items.


Approximately 60 miles south of Carson City, NV on Hwy 395: (OPTIONS 1, 2 & 3)


BOOTLEG CAMPGROUND: Perform crack sealing according to the schedule of items.


CHRIS FLAT CAMPGROUND: Perform crack sealing according to the schedule of items.


SHINGLE MILL DAY USE AREA: Perform crack sealing according to the schedule of items.


ALL LOCATIONS:


Work shall be performed in accordance with the STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, (FP-03), and the Forest Service Supplemental Specifications (FSSS).


Tanya Spanfellner, Contracting Officer, Phone 208-373-4130, Fax 208-373-4197, Email [email protected]