The Contractor shall provide all labor, materials, and equipment necessary to perform the Work. The Work shall include, but not be limited to, mobilization and demobilization at or to the Project Site, dredging and placement of fill material, placement of geotextiles and rip-rap stone, and timber pile dolphin and permanent sign replacement