The University seeks a Construction Manager/General Contractor (CM/GC) to oversee a multi-phased utility infrastructure improvements project to be completed over a multi-year coordinated construction schedule. In general, the Project shall consist of the following:

1. Renovation of an existing cogeneration facility. Including, but not limited to, the replacement of steam, chilled water, condensate, and electrical systems. The installation of new electric chillers and an extraction steam turbine. The existing facility currently known as the ?Powerhouse? shall be renamed and referenced as the West District Energy Plant (WDEP). The existing WDEP steam system shall remain operational throughout the renovation. All work shall be coordinated to maintain reliable operations and limit down time throughout construction. Temporary cooling systems shall be required during renovation of the chilled water plant.

2. Construction of a new conventional heating and cooling plant. Including, but not limited to, the installation of new custom built dual fuel boilers, chillers, all auxiliary equipment, and a PLC based control system. The facility shall be located adjacent to the existing Coors Event Center and be named the East District Energy Plant (EDEP).

3. Installation of new and renovation of existing steam, condensate, chilled water, and network utility distribution systems. Specifically, the interconnection of the systems between the plants and new chilled water distribution for the Kittredge residential area.

4. Construction of a new integrated control system network for complete interoperability of both WDEP and EDEP.