PROJECT TITLE: CAMP CREEK WASH ROAD AND TRAIL OBLITERATION
SCOPE: The objective is to restore the natural habitat of areas in Camp Creek Wash impacted by unauthorized motorized routes by obliterating these routes and restoring the natural topography. Approximately 20 miles of unauthorized roads and trails will be obliterated and natural drainage paths restored by constructing water-bars and berns, outsloping, filling ruts by pulling side-cast material back into the disturbed area, and moving and placing boulders. A Sweco or similar mechanical equipment will be used to accomplish the work.
The magnitude of this project is less than $25,000. The acquisition is a total small-business set-aside.
No formal site visit will be held.
Work to begin within 30 days of acceptance of contract.
Work to be completed by September 1, 2014.