Due Date:
October 17, 2012
Description: This project involves the restoration and stabilizing of 800 linear feet of arrested channel bank and bed erosion of the stream located on the Calvert's Walk Apartment Complex in Bel Air, MD. This project will alleviate property damage and the excessive accumulation of sediment in downstream water bodies attributed to degradation of the stream.
PreBid Meeting:
A Pre-Bid conference will be held for this project on October 2, 2012, in the 3rd floor conference room at 212 S. Bond Street, Bel Air, MD 21014 at 10:00 AM local time. Attendance is NOT mandatory, but is strongly advised.
Questions Due:
NOTE: Questions concerning this solicitation must be emailed no later than 5:00 pm Eastern Standard Time on Wednesday, October 10, 2012.
PreQualifications:
B - Grading - and -
G1 - Roadside - and -
G2 - Site