This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart
12.6, as supplemented with additional information included in this notice.
This announcement signifies request for quotes issuance. Indiana National Guard intends to award a firm fixed
price contract and will utilize procedures under FAR parts 13 and 15. This solicitation document with incorporated
provisions and clauses are in effect through Federal Acquisition Circular 2005-66. The clauses and provisions
referenced in this solicitation can be found in full text format at http://farsite.hill.af.mil/ The North American Industry
Classification System (NAICS) Code is 332618. The small business size standard is 500 personnel.
The Indiana Army National Guard (IN-ARNG) has a requirement for caging and lockers at Angola Armory located 904 Williams Street, Angola, IN 46703. The IN-ARNG expects vendors to offer similar steel caging partitions with locker. The partitions shall reach from the ceiling to the floor providing division between each areas and security to its contents.The vendor is requiring to delivery and installation of the caging offered. Caging sizes vary from location to location. Measurements and diagrams shall not be provided by the Indiana National Guard.
Contractor:
Provide the materials, labor and equipment to fabricate and install a storage area caging system
Consist of five caged enclosures
The caging system shall be constructed of mild 2 quote mark box tube columns at corners and door edges
There shall be five hinged doors and two sliding doors. All door shall incorporate simple hasp type receivers for pad lock
The cage screen panels has be of 1 quote mark x 1 1/2 quote mark woven welded wire mesh. The grid of the panels shall run in a horizontal /vertical configuration.
Screens and framing shall be anchored to the existing concrete floor with wedge anchors.
Dismantle current wood enclosure
Provide dumpster for demolition debris
Upon delivery of material, manpower is requiring to off load.
Site Visit
However, all vendors/offerors are encouraged to attend a site visit on 18 June 2014 at 10:30 a.m. EST. This site visit is not mandatory per the following provision:
52.237-1 Site Visit
No other site visits shall be authorized. The intent of the Site Visit is as follows:
a) To provide opportunity to take measurements
b) To orient potential contractor to the locations of work
c) To become familiar with the existing structures
d) To become aware of any personnel
For more details, click on the quote mark additional documentations quote mark link.
Eric Sweatt, 317-247-3310
USPFO for Indiana