The demolition and renovation scope will be approximately 2146 GSF of the existing space. This space will require the demo and removal including but not limited, selective demolition, lathe ceilings, fire sprinklers, fire alarm devices, MEP systems as shown on the drawings. The space will require new construction of metal fabrications, rough carpentry, metal wall panels, intumescent fireproofing, penetration firestopping, joint sealants, access doors and frames, door hardware, automatic door operators, glazing, testing for floor finishes, resinous flooring, gypsum board, high-performance coatings, epoxy coating, signage, fire extinguishers, fire protection systems, MEP systems, testing, commissioning, coordination of equipment requirements with vendors as shown on the drawings