The consultants primary tasks will be:
 Provide professional engineering services to the Owner as part of a project team.
 Familiarization with the utilitys systems and data including demand projection model.
 Review the 2008 Water Management and Conservation Plan.
 High level review of design criteria and concepts presented by the owner.
 Review of the utilities existing hydraulic model (KYPIPE) and data set and calibration.
 Analysis of current and future reservoir storage requirements.
 Analysis of proposed treatment plant sites and backbone transmission system requirements.
o Hydraulic modeling of scenarios developed by the consultant will be performed by the Owner.
o Transmission main construction costs will be supplied by the Owner.
 Preparation of a 20-year major capital improvements plan focused on new filtration plants, reservoir storage and major transmission mains.
 Assist in presenting the updated Water Master Plan to the SUB Board members.
 Review of water division management systems including:
○ Asset Management ○ SCADA System ○ Reports and trending