The City is accepting bids for COMMUNITY CENTER RENOVATION for work shown on architectural and civil plans dated February 8, 2011 and all applicable addenda including, but not limited to, grading and site preparation; installation of gravel parking area and concrete ADA parking space and sidewalk; demolition of existing restrooms and porch; construction of new restrooms/storage area addition and porch; sealing of existing ACM tile and addition of new flooring in community room; installation of VCT and ceramic tile in restrooms; replacement of existing windows, doors, sinks fixtures, cabinets, countertops, toilets; painting, replacement of electrical and plumbing; and installation heating and air conditioning system in the existing Bethwell Community Center. The location of the work is Bethwell Community Center in Milton, Georgia.
The RFB (Request for Bid) document is located at http://www.cityofmiltonga.us/ or http://ssl.doas.state.ga.us/PRSapp/PR_index.jsp
The Plans will be available for pickup on Monday, February 14th, 2011. All interested vendors may pick up plans (on a CD) at the City of Milton for no charge during normal business hours. Your contacts for the plans are Rick Pearce or Cyndee Bonacci (Suite 107G). There will be a mandatory pre-bid meeting at the Bethwell Community Center, 2695 Hopewell Road, Milton, Georgia on Thursday, February 24th at 10 a.m. Please hold all questions until the pre-bid meeting. The Bethwell Community Center will be open to contractors by appointment only after the pre-bid meeting through March 9th, 2011.
The Bidder must have a current General Contractor License issued by the State of Georgia with a minimum requirement of Light Commercial.
Sealed bids will be received no later than 2:00 PM Local Time on March 15th. Sealed bids shall be submitted to: City of Milton Attn: Rick Pearce, Purchasing Office 13000 Deerfield Pkwy Suite 107G Milton, Ga. 30004.