THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT ********* ADVERTISEMENT DATE - JULY 7, 2014. THIS WILL BE ********* ON A FUL LAND OPEN BASIS.
PROJECT CO ER 43(1), Larimer County Road 43
The Government intends to use a bid Single Award Task Order ******** (SATOC) with possible Construction Manager (CM) services integrated to perform repairs to Larimer County Road 43 caused by the September, 2013 floods. It is assumed that there will be a base or seed ******** (Schedule A), and 3 Task Orders comprised of Option X, CM/GC Services, and Option Y. Schedule A focuses on roadway segments within US Forest Service (USFS) property, which is estimated to be 2.1 miles in length. Task Order 1 (Option X) and Task Order 3(Option Y) includes (8) drainage crossings and the structural section of the entire 10 mile project. Task Order 2 (CM/GC services) would be needed for constructability reviews of the remaining 7.9 miles of roadway, specifically the logistical approach for reconstruction and phasing.
Mile post reference within this report assumes Drake as mile post (MP) 0.0, Glen Haven as MP 7.8, and the end of project at West Creek as MP 10.0. No Work is planned for (MP10-MP15): this section of roadway is in good condition and no work is planned at this time.
SCHEDULE A- Base ******** (MP 3.9-4.4 & 5.8-7.4): Schedule A will include major roadway plan and profile reconstruction of 2.1 miles of roadway within USFS property. Major construction scope will include excavation, embankment, roadway cross drainage and armoring withi...