THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to [email protected] or by telefax to 720-963-3360 (Attn: Craig Holsopple) for receipt by close of business (2 p.m. local Denver time) on June 10, 2014:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program. In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility - DO NOT SEND COPIES OF YOUR CCR PROFILE;
(3) Letter from bonding agent stating your firm's capability to bond for a single project of $40 million, and your firm's aggregate bonding capacity; and
(4) Provide a list of construction projects of equal or greater value in which you performed CMGC (as the construction manager and general contractor) as a construction manager (CM) during the design/pre-construction phase and as the general contractor (GC) during construction. Design experience should include roadway design, specifically the logistical approach for reconstruction and phasing. Upon completion of design, FHWA can exercise the contract options and award the construction portion of the contract based on a fair and reasonable negotiated price. Construction experience should include work in excavation, embankment, roadway cross drainage, armoring, box culvert, aggregate base, and hot asphalt pavement. State whether your firm was the prime contract or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.
PROJECT DETAILS: CO ER 43(1), Larimer County Road 43
The Government intends to use a competitively bid Single Award Task Order Contract (SATOC) with possible Construction Manager (CM) services integrated to perform repairs to Larimer County Road 43 caused by the September, 2013 floods. It is assumed that there will be a base or seed contract (Schedule A), and 3 Task Orders comprised of Option X, CM/GC Services, and Option Y. Schedule A focuses on roadway segments within US Forest Service (USFS) property, which is estimated to be 2.1 miles in length. Task Order 1 (Option X) and Task Order 3(Option Y) includes (8) drainage crossings and the structural section of the entire 10 mile project. Task Order 2 (CM/GC services) would be needed for undefined or incomplete design of the remaining 7.9 miles of roadway, specifically the logistical approach for reconstruction and phasing.
Mile post reference within this report assume Drake as mile post (MP) 0.0, Glen Haven as MP 7.8, and the end of project at West Creek as MP 10.0. No Work is planned for (MP10-MP15): this section of roadway is in good condition and no work is planned at this time.
SCHEDULE A- Base Contract (MP 3.9-4.4 & 5.8-7.4): Schedule A will include major roadway plan and profile reconstruction of 2.1 miles of roadway within USFS property. Major construction scope will include excavation, embankment, roadway cross drainage and armoring within the 2.1 mile segment. Additionally, production of aggregates, fill, and armoring material will initiated during this phase from on-site excavated materials. These materials will be produced for this segment of road, as well as areas outside of the segment and within project boundaries. The preliminary construction estimate for this work is $9-13.0M. Major construction item quantities are as follows:
Item
Quantity
Comments
Excavation/rock cut
100,000 CY
Avg. 20' shift in-board; Schedule A limits only.
Embankment
10,000 CY
Schedule A limits only.
Pulverize
30,000 SY
Pulverize existing 4-inch and re-use for temp surface and/or yellow top.
Aggregate Base (Production)
30,000 CY
Assumes 6-inch section; volume for entire route
Riprap (Class 5) Grouted
20,000 CY
Class to be verified; volume for Schedule A
Riprap (Class 5) (Production)
40,000 CY
Class to be verified. Volume is total remaining for route; outside of Schedule A.
24-inch Pipe Culvert
5,000 LNFT
Cross drainage every 500 LNFT of roadway; entire route
Clearing and Grubbing
20 ACRE
Schedule A limits only.
Task Order 1 (OPTION X): - Drainage Crossings (8 Locations): A construction option advertised for pricing for (8) 18-foot span x 10-foot rise box culverts at 50 lineal feet each or 400 lineal feet total. Actual sizing will be confirmed through hydraulic analysis. All crossing are assumed to within Segment 2.
Task Order 2 (CM/GC Services): This option will be priced for the CM services only. CM services will be based on the anticipated major roadway plan and profile construction for all work not included in Schedule A. Major construction scope will include excavation, embankment, roadway cross drainage and armoring within for over 7.4 miles of roadway. Construction of this work will require significant private parcel right-of-way acquisition. Task Orders will be issued throughout the duration of the project to execute the construction of the assumed scope. Right-of-way and Environment input will be critical for phasing of this construction. The preliminary construction estimate for this work is $6-8.0M. Major construction item quantities are as follows:
Item
Quantity
Comments
Excavation/rock cut
280,000 CY
Avg. 10' shift in-board
Embankment
120,000 CY
Waste/Excess Material
160,000 CY
Pulverize
110,000 SY
Pulverize existing 4-inch section and re-use for temp surface and/or yellow top
Riprap (Class 5) Grouted
60,000 CY
Class to be verified
Clearing and Grubbing
60 ACRE
Seeding and Mulching
•80 CRE
Task Order 3 (OPTION Y): - This option will be for construction pricing for surfacing of the entire 10 mile project. Major construction scope will include aggregate base placement and hot-mix asphalt. The preliminary construction estimate for this work is $7-9.0M. Major construction item quantities are as follows:
Item
Quantity
Comments
Aggregate Base (Placement)
30,000 CY
HACP
35,000 TON
Assumes 4-inch section, 2 lifts
It is anticipated that this project will be advertised in July, 2014 with construction occurring from August, 2014 through September, 2015.
The contracting range for this project is between $30 and $40 million.
Craig Holsopple, Acquisition Program Specialist, Phone 720-963-3350, Fax 720-963-3360, Email [email protected] - Jason J Longshore, Contract Specialist, Phone 7209633090, Fax 7209633360, Email [email protected]