OC WASTE & RECYCLING IS SOLICITING BIDS FOR THE CHAIN LINK FENCING
PROJECT AT OLINDA ALPHA LANDFILL AND VILLA PARK LANDFILL.
THE PROJECT AT OLINDA ALPHA LANDFILL INCLUDES MOBILIZATION, POST HOLE
PREPARATION, FOOTINGS, AND BACKFILLING; INSTALLATION OF CHAIN LINK
FENCING MATERIALS, SUCH AS STRUCTURAL LINE POSTS, SCHEDULE 40 END
POSTS, NINE GAUGE FABRIC, TENSION BANDS, BARS AND WIRE, BARB LINE
ARMS, CORNER BARB ARMS AND THREE STRAND FOUR POINT BARB WIRE, SLIDE
GATE, ALL REQUIRED CONNECTING PARTS, AND DEMOBILIZATION. THE PROJECT
AT THE VILLA PARK LANDFILL INCLUDES MOBILIZATION, POST HOLE
PREPARATION, FOOTINGS, AND BACKFILLING; INSTALLATION OF CHAIN LINK
FENCING MATERIALS, SUCH AS STRUCTURAL LINE POSTS, SCHEDULE 40 END
POSTS, NINE GAUGE FABRIC, TENSION BANDS, BARS AND WIRE, ALL REQUIRED
CONNECTING PARTS, AND DEMOBILIZATION.