The Electrical Contractor shall be the Prime Contractor for this project. Work shall be inclusive but not limited to the installation of a new integrated IP (CCTV) CLOSED-CIRCUIT TELEVISION CAMERA SYSTEM. All work shall be performed during the hours of 3:00 PM till 10:00 PM Monday through Friday. All programming may be done during normal work hours under the supervision of school personnel.