Bus Bay Construction at SW 152 St. & 152 Ave.


Florida, United States
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Announcement Info : This is a federally funded project and requires the application of the Davis Bacon Wage Decision No. Fl20080044 02/08 2008 FL44. This project consists of but is not limited to the following: 1. The Contractor is to provide all labor, equipment, materials and supervision for the construction of a bus bay for Miami-Dade County Transit. The work shall include demolition, excavation, concrete slab, curb, and sidewalk construction, drainage installations, pavement marking, signage, and all incidentals necessary to the successful delivery of this project. 2. The contractor shall legally and properly dispose of debris generated during the course of providing the services outlined in the specifications and set of plans provided. 3. Permits f required, all prmits will be prepaid by the contractor and reimbursed by Miami-Dade Transit upon presentation of receipt certifying invoices for such permits were paid for by the contractor. It is further the responsibility of the contractor to notify all regulatory agencies having jurisdiction including DERM, other Miami-Dade County agencies and municipalities as require. Materials: The following Drainage System materials will be provided by Miami-Dade County Transit: 1. 1 each - P-48, CB (catch Basin) w Top Slab, 8" Wall w/ISF #4700-6233 F & G 2. 1 each - HDPE Baffle for 48" Round Structure an Pipe from 15"-24" 3. 60LFT - 24" HDPE Solid B/S 4. 20LFT - 24" HDPE Perforated B/S 5. 1 each - 24" End Cap Storm Seal 6. 1 each - 24" Split Coupler Band 7. 1 each - ACF P45/45 Woven Filter fabric 15' X3 28.1' NOTE: Davis Bacon General Wage Decision: FL20080044 02/08/2008 FL44 will be in efect on this project. Contract Duration: Sixty (60) calendar days subsequent to issuing of the Notice to Proceed. This project is location at: SW 152nd Street and SW 152nd Avenue, Miami, Florida. Cost for Bid Documents: $50.00 for new bidders ONLY Contractors who submitted bids on this project previously will not be charged for revised Design Drawings. Acceptable Forms of Payment: Company Check, Cashier's Check or Money Order Made payable to: Miami-Dade County Board of County Commissioners Bid due date: Wednesday, July 15, 2009 Time of Opening: 2:00 P.M. Where: Clerk of the Board 17th Floor 111 NW 1st Street Miami, Florida 33128 Bid Bond required: Yes; (5%) percent of contrators' bid price. Payment and Performance Bond required: No. NOTE: All Terms and conditions of Contract No. CICC 7360-0/08 will be enforced. Project Manager: Mr. Javier Salmon Contact person: Angelica de Limas Contact phone No.: (786) 469-5282

Technical Certification : GENERAL BUILDING CONTRACTOR, GENERAL ENGINEERING, BUILDING CONTRACTOR

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP