The RFP Database
New business relationships start here

Bryner Ploutz


District Of Columbia, United States
Government : Federal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

This project materially consists of: Tapping into an existing 36" HDPE irrigation pipeline to add a 10" HPDE
junction; placing ~770' LF of 10" HDPE pipeline, including one road crossing with multiple utilities;
connecting new 10" HDPE pipeline to existing 10" HDPE pipeline; installing all pipeline appurtenances; and
constructing a pumping plant with VFD.
All work is to be completed summer/early fall 2019 during the irrigation season. Water in the 36" pipeline
will be shut off for the minimum duration possible and work should be planned for an expeditious
connection to the supply pipeline. Work period is estimated to be 14-28 days. Completion is required prior
to Sep 30, 2019.

There is no visit planned at this time. If you need to see the site, Please call and we will arrange to let you see it.


Howard Stover, Contract Specialist, Phone 651-602-7934, Email Howard.Stover@wdc.usda.gov

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP