This document has expired, therefore the above link may no longer work.
BRIDGE PAINTING, SOUTH DISTRICT, 2010: REMOVE AND REPLACE THE STRUCTURAL STEEL COATING SYSTEM ON THE BRIDGES IDENTIFIED BY THE CONTRACT. SUPPLY AND MAINTAIN MAINTENANCE OF TRAFFIC AS NECESSARY