To complete flood related restorations and non-flood related. the work includes (but is not limited to) clearing and grubbing, remove and dispose of existing debris, silt and water material, remove and dispose of two culverts, coordination and the relocation of existing Telus line, excavate and lower existing roadway, supply and place granular surfacing, trim existing creek banks, supply and place rip rap, supply and place longitudinal stone toe protection, supply and place erosion control blanket and seeding.