Work involved in the design of the project consists of: Bridge Replacement. The State would be looking into the Accelerated Bridge Construction (ABC) Technology, with use of the Prefabricated Bridge Element and Systems (PBES) and the use of the Self-Propelled Modular Transporters (SPMT) on this structure.