Bridge Replacement


Vermont, United States
Government : County
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Removal of existing cast-in-place concrete abutments. Construction of a new bridge structure to include, but is not limited to steel pilings, cast-in-place reinforced concrete abutments, cast-in-place reinforced concrete approach slabs, cast-in-place reinforced concrete wing walls, reinforced precast deck panels, cast-in-place reinformced concrete bridge deck, structural steel, shear connections, water repellent, new bridge and roadway guardrails, stream channel restoration, stone fill and road reconstruction.