The project includes demolition of the existing bridge and associated structures; constructing the replacement bridge, and guardwalls; reconstructing pavement areas; cold planing; installing waterlines, signage, pavement markers, and striping; removal of detour road and temporary stream crossing structure; and restoration of properties to existing conditions.