The purpose of the project is the rehabilitation of the bridge over the CSX and Norfolk Southern railroad. The rehabilitation includes asphalt overlay and resurfacing, patching of superstructure and substructure, fiber reinforced polymer wrapping, concrete sealing, and repair of channel protection. The bridge rehabilitation consists of minor superstructure rehabilitation of the existing bridge, including removing and replacing the vandal protection fence, and removing and replacing the existing concrete parapets, and such other work as may be necessary to complete the contract in accordance with the plans and specifications set forth in the Bid Submittal Documents.