This document has expired, therefore the above link may no longer work.
This is a bridge rehabilitation project consisting of removal of old bridge deck and replacement with concrete superstructure. Associated work includes asphalt roadway reconstruction, mill and inlay, guardrail, and rip rap stream bank stabilization